Review mode · notes and script ARAKA / PAEIRO · 12 NOV 2026
+PROJECT MODEL / DIGITAL STUDY

ARAKA ADVANCED SYSTEMS / PAEIRO

THE NEXT MOVEMENT

A NEW CHAPTER FOR YOUR PRODUCTION

Your Paeiro.A newscale.

More capacity for your Paeiro, with less dependence on manual assembly. A tailored production system starts with your product.

ENTER THE MECHANISM10 gestures. Every detail.
300

CASE STUDY / REFERENCE CAPACITY

The workload of 300 people.
Our pricing reference.

A tube-making case study, with a small operating crew. A price commitment for that capacity, against the agreed product, quality and working schedule.

02 / YOUR FACTORY’S NEXT CHAPTER

The product is yours.
Make the next scale yours.

More capacity to serve orders. Less dependence on repetitive manual assembly. The same attention to the details that define your Paeiro.

DEVELOPED AROUND YOUR PRODUCT

From the magazine to the wipe after the blue cap. Every gesture has a place in the design.

See the details in motion ↓
How the design opened the route to prototyping +

Thirty partners initially declined the project. A new ARAKA design changed the assessment and opened a route to prototyping.

ARAKA’s account of its partner discussions. The physical machine remains to be built and tested.

03 / EVERY GESTURE, A MECHANISM

03 — 09

Every detail.
In motion.

Magazine to finishing. Malu’s narration and the mechanism move together. Pause to inspect.

Movement is slowed down to reveal each detail. A digital mechanism study; the physical prototype remains to be built.

01 / 10

MECHANISM STUDY
THE ORIGINAL GESTUREManual footage
THE PROPOSED MECHANISMInteractive 3D

Preparing the mechanism…

Drag to orbit · scroll to zoom
IN FOCUSGuided sequence / 10 steps
↗

Inspect the mechanical detail ↗

INSPECTION POINT

DURING PROTOTYPING

Add a review note for this step

Private notes in this browser; nothing is sent.

NARRATION / PORTUGUESEMalu · synchronized recording

Digital mechanism study. Physical validation follows in prototyping. Magazine feed appears in 3D; the next nine actions accompany the manual footage.

Review the complete Portuguese script

Edit the text below to prepare the narration. Changes are saved only in this browser and do not alter the current recording. Export the text to prepare a new recording.

Download recorded script

04 / THE PRODUCTION ARCHITECTURE

04 — 09

Many modules.
One connected operation.

Prepared material to finished empty tube. Coordinated mechanisms, with support and position considered at every step.

Digital study of the complete Paeiro tube production line
PROJECT MODEL / DIGITAL STUDY · Proposed conveyor outfeed · illustrative architecture
INPUT

Prepared wrapper material

Ready for sizing and rolling, matching the agreed samples.

PRODUCTION SYSTEM OUTPUT

Empty tubes for your next station

Proposed outfeed conveyor to the existing tobacco shaker. Interface and transfer to be defined with your factory.

Study of the proposed outfeed conveyor, without customer equipment
CONVEYOR HANDOFF / PROPOSEDInterface, height and transfer rate to be defined with your factory.
The ten process operations
  1. 01Size-cut the wrapper
  2. 02Start the roll and form the filter pocket
  3. 03Insert the filter at one end
  4. 04Complete the roll
  5. 05Trim the tip
  6. 06Apply the retaining band
  7. 07Meter glue beside the filter
  8. 08Fit the blue plastic cap
  9. 09Wipe excess glue
  10. 10Convey to the next station (proposed)

THE INDUSTRIAL FOUNDATION

Established functions.
New integration.

Feeding, cutting, winding, dispensing, seating and wiping already feature in other industrial lines. Our work is to adapt those principles to your product and connect the modules into one operation.

↗

The Paeiro line is new. The industrial functions behind the design have commercial precedents.

Explore 11 industrial references
01Thin sheets and porous materialsSheet feedingSchmalz

Grippers for paper and foil separation, plus high-flow handling of porous materials.

Paeiro adaptationLeaf porosity, separation and marking still need sample trials.

Read the manufacturer’s reference ↗
02Textile cuttingSizing and trimmingZünd

Automated textile cutting with vacuum hold-down.

Paeiro adaptationPaeiro needs its own blade, support geometry and edge-quality tests.

Read the manufacturer’s reference ↗
03Paper tubes and coresForming around a mandrelSODALTECH

Commercial convolute winding wraps sheets around a mandrel to form paper cores.

Paeiro adaptationThis example makes much larger, thicker cores. It supports the principle, not our leaf-forming design.

Read the manufacturer’s reference ↗
04Paper filter tubesTube and filter productionKörber / Nano-T

Körber describes the Nano-T as commercial equipment for making paper filter tubes.

Paeiro adaptationPaper-based tube production is established; the Paeiro leaf, pre-curl sequence and filter interface need their own development.

Read the manufacturer’s reference ↗
05Food packagingElastic-band applicationFelins

The ARB loads, stretches and applies elastic bands automatically.

Paeiro adaptationBand dimensions, supply and gentle placement on our small tube remain custom work.

Read the manufacturer’s reference ↗
06Industrial adhesive assemblyMetered adhesiveNordson EFD

Industrial valves and automated dispensing systems control glue deposits and placement.

Paeiro adaptationAdhesive, dose, contact surfaces and cure behavior must be qualified for Paeiro.

Read the manufacturer’s reference ↗
07Plastic-component handlingOrienting and feeding componentsRNA Automation

A published cap-feeding system sorts orientation and feeds correctly presented caps into an existing line.

Paeiro adaptationCap and filter geometry, singulation and feed paths must be engineered for our parts.

Read the manufacturer’s reference ↗
08Precision assemblyGuided insertionSCHMIDT Technology

ServoPress modules control travel and force for joining parts in automated lines.

Paeiro adaptationOur filter/cap tooling needs a suitable low-force range and compliant product support.

Read the manufacturer’s reference ↗
09Electronics manufacturingWiping with fresh cleaning fabricASMPT / DEK

DEK TQ has automatic understencil cleaning with a fabric roll; DEK fabrics collect residual solder paste.

Paeiro adaptationThis is an analogy for renewable wiping media. Removing wet glue from Paeiro requires separate contact and smear trials.

Read the manufacturer’s reference ↗Supporting reference ↗
10Packaging inspectionPresence and position checksCognex

Machine vision checks whether caps are present and aligned.

Paeiro adaptationPaeiro needs its own lighting and acceptance rules; visible inspection does not prove internal bond or airflow.

Read the manufacturer’s reference ↗
11Assembly and industrial material handlingConveyor handoffDorner

The 2200 conveyor family documents small-part transfer, infeed/outfeed, guiding options and close conveyor-to-conveyor transfers.

Paeiro adaptationCommercial precedent for the function, not the illustrated belt or a selected supplier. Paeiro support, belt width, orientation, transfer, buffer and shaker interface need their own engineering.

Read the manufacturer’s reference ↗

Public manufacturer references reviewed on 12 November 2026. These illustrate functions and principles; they are not a list of contracted suppliers or proof that the Paeiro modules are ready. Geometry, materials, feeding, integration and performance require adaptation and validation.

05 / HOW ARAKA CONNECTS THE WORK

AI to develop.
Presence to execute.

AI-assisted analysis helps turn the observed process into mechanism alternatives and digital studies. Our presence in China connects that work to engineering, manufacturers and prototyping.

Explore the development programme ↓
Digital study of filter insertion
PROJECT DIGITAL STUDY / GUIDED INSERTION

06 / A CLEAR PATH TO PRODUCTION

06 — 09

First, prove the process.
Then build for production.

01

NOW

Define your reference

Samples, product, current production and quality criteria. The reference configuration uses an eight-hour day, five days a week, to be specified with the customer.

02

AROUND 12 MONTHS

Develop the working prototype

Customize and integrate the modules, test materials and demonstrate the process. Monthly reports follow results, expenses and upcoming milestones.

03

AFTER VALIDATION

Manufacture, install and commission

The full production system is manufactured after the prototype. Scale-up, transport, import and installation have their own schedule, agreed in the proposal.

Around 12 months to a working prototype. Full manufacture and installation follow. Conveyor outfeed is the proposed direction; its interface remains to be defined.

BEFORE FULL MANUFACTURE

Prove it with your product.

The prototype must validate the process. The production system must demonstrate the agreed capacity during acceptance testing.

What we propose to demonstrate +
01

Your product

Wrapper, filter, band, adhesive and blue cap. Finish and fit assessed using your samples.

02

A repeatable cycle

Repeat the operations and record cycle times, good units, rejects and interventions.

03

The path to scale

Use the results to define parallelization, feeding, transfers and the interface to the next station.

Proposed test areas. Samples, test duration, quality thresholds and scale-up conditions will be agreed together before development.

Guided blue-cap seating study
PROJECT MODEL / DIGITAL STUDY / GUIDED SEATING

07 / THE ADVANTAGE OF STARTING TOGETHER

07 — 09

One reference.
A firm price.

We use a 300-person production workload as our case study. For that capacity, we commit to €4.86 million for the founding customer and €6.86 million for later customers. Development is included in the price.

FOUNDING CUSTOMER / 300-PERSON CAPACITY

€4.86million

Total installed price of the reference system.

€860,000fixed prototype contribution
+
€4 millionbalance after the full credit

The development contribution is fully credited toward the purchase. Additional development costs are borne by ARAKA. If unused funds are returned, the credit is adjusted to preserve the agreed total price.

Let’s talk ↗

LATER CUSTOMERS / SAME CAPACITY

€6.86million

Price for the same 300-person reference capacity, following design validation.

120 manufacturing days

Target for a repeat of the validated configuration. Logistics and installation have separate lead times.

€2 milliondifference against the later-customer price
Other production capacities +

A DIFFERENT PRODUCTION SCALE?

Custom configurations for different needs. Select a capacity reference.

€4.86m founding · €6.86m later

The reference system for this partnership. The twelve months refer to the prototype; full manufacture follows.

Check the return with your numbers ↓

08 / OUR CONFIDENCE COMES WITH A COMMITMENT

We put our own
money behind it.

If, for any reason, you consider the developed result insufficient to proceed with the purchase, ARAKA shares the development expenses with you.

You initially fund the €860,000 programme. If the result is insufficient for you to buy, we return unused funds and reimburse half the actual expenses from ARAKA’s own funds.

50%

of actual development expenses covered by ARAKA

  • ↗All unused funding is returned.
  • ↗Repayment within 30 days of your decision.
See how the cost sharing works
€0€860k
Unused funding returned€0
Half the expenses reimbursed by ARAKA€430,000
Total returned to you€430,000
Your net development cost€430,000

YOUR FACTORY. YOUR ASSUMPTIONS.

Your numbers.
Your return.

Model the reference system for a 300-person workload. Every input is editable; the calculation starts with cost reduction, with no assumed growth revenue.

Earlier working scenario

R$20m/year current cost; illustrative exchange rate of 6.0692 BRL/EUR; €350k/year line operating budget. These are planning inputs, not verified payroll, a live exchange rate or a validated operating budget.

Include only costs attributable to the automated work. If staff are reassigned without reducing cash spending, lower the avoided share. The small line crew is included in the operating budget below.

Annual line operating budget€350,000

Editable allowances from the earlier discussion. They include the retained crew; do not subtract it twice. Support is an allowance, not a new service quote. Remove overlaps between staffing and maintenance.

Investment, timing and horizon

The €860k prototype contribution is already inside the founding price. The following six months are an editable scenario assumption, not an agreed delivery date. Later customers have zero prototype months only after validation; the 120 manufacturing-day target remains separate from logistics and installation.

YOUR SCENARIO RESULT

Net annual operating saving—
Payback after production starts—
ROI over 5 operating years—
Current cost converted to EUR
—
Annual cost actually avoided
—
Less line operating budget
—
Net monthly saving
—
Total scenario investment
—
Wait before production
—
Simple recovery including this wait
—
Net balance after 5 operating years
—

Simple undiscounted return. No benefits before production starts. Excludes tax, interest, inflation, residual value and working capital. Product materials and downstream processes retained by the customer are excluded from both sides.

Open every formula and cumulative cash flow
Operating yearCumulative savingBalance after investment

Year zero subtracts the entire investment for this simple calculation; it does not reproduce contractual payment milestones. The horizon starts after the stated wait, not at signing.

09 / BEFORE WE START

The questions
that matter.

Does the machine exist yet?

The complete Paeiro line remains to be built and tested. The functions behind the design—feeding, cutting, forming, dispensing, seating, wiping and inspection—have commercial applications in other industries, documented in this page’s references. Prototyping adapts the mechanisms to Paeiro materials, integrates the modules and validates the result against agreed criteria.

What does 300-person capacity mean?

It is the reference workload of a 300-person tube-making team. The system is developed to replace that workload, retaining a small replenishment, supervision and maintenance crew. Product, quality, working schedule and baseline production will be agreed with your factory.

Is the €860,000 additional to the machine price?

It forms part of the founding customer’s €4.86 million total. With the full €860,000 credit, the balance is €4 million. The customer’s development contribution is fixed; ARAKA covers additional development costs.

What sits outside the supplied process?

Input is material prepared for sizing and forming. The proposed output is empty tubes conveyed to the customer’s next station. Tobacco filling and existing shakers remain with the customer; the connection, position and transfer rate will be defined together.

What if we need another capacity or format?

Different capacities, materials and formats require their own customization. We first agree the required product and output, then define the configuration, budget and schedule. The 300-person system’s prices and timelines do not automatically apply to other configurations.

THE NEXT STEP IS ABOUT YOUR FACTORY

What is the next scale
for your business?

Your product. Your production. The criteria that make this machine right for you.

Start with: product samples · good units per shift · people by operation.

Discuss my production ↗gilad@arakasys.com
ARAKAPAEIRO / THE NEXT CHAPTER
ARCHITECTURE STUDY / PROPOSED OUTFEED

Illustrative architecture with proposed conveyor, not the final configuration for the case-study capacity. Demonstration motion; the factory interface remains to be defined.